Job Description : The work consists of the construction of the third cell at the Ghabawi landfill, it includes excavation & Filling of the cell with total volume almost ---- cubic meter, and the formation of the side slops, also it includes the supply and apply of the GSL material to the entire cell and its slops , the filtration and collection system of the sump generated will also be supplied and installed by the contractor.
The project includes the repair of the GSL of Cell no 1 and reshape, restoration of the side slope to become 33% slope